Renee Sinden Managing Director, Services & Infrastructure
Share this article

In our first article, The $7 Trillion AI Infrastructure Boom: reshaping data center construction and engineering, we examined how AI-driven demand is accelerating data center construction and reshaping the global infrastructure landscape.

But rapid expansion brings structural pressure. As investment intensifies across hyperscale campuses, grid modernization, and advanced manufacturing; firms operating in the data center construction market face mounting operational, financial, and regulatory realities.

This second installment focuses on the most pressing data center construction challenges emerging within the AI infrastructure boom, and how engineering and construction (E&C) leaders can navigate volatility without sacrificing long-term growth. 

Workforce shortages and skills gaps in data center construction 

The most immediate constraint facing the data center construction market is people. A new BlackRock analysis warns that as we enter a “generation-defining construction boom” the workforce needed to deliver it simply isn’t there. In the context of rapid growth and significant investments in hyperscale facilities, labor availability has become a defining operational risk.  

The U.S. is already feeling the strain:

  • Many skilled trades professionals are retiring earlier than expected.
  • Immigration limits have reduced the inflow of new workers.
  • Unemployment in many construction trades is near historic lows.
  • Demand for specialized labor is surging, especially for data centers, grid modernization efforts, and energy infrastructure.

The challenge is not only short term. Sustained growth in the data center construction sector means firms must rethink workforce planning, training, and retention strategies to support long-term delivery pipelines. 

How firms can respond 

  • Invest in workforce development: Upskill existing teams in digital tools, AI assisted workflows, and data literacy.
  • Partner with trade schools and apprenticeship programs: Build long term talent pipelines instead of relying solely on the open market.
  • Self-perform strategically: Firms with strong in-house craft capabilities can better control quality, scheduling, and cost. These are critical advantages when subcontractor availability is tight.
  • Adopt AI-enabled labor planning: Predictive scheduling and resource optimization help firms deploy scarce talent more effectively. 

Global supply chain pressure in large-scale infrastructure projects 

The AI construction boom is stretching global supply chains to their limits. Critical electrical equipment, such as transformers, switchgear, and switchboards, face multi-year lead times. Semiconductor-driven components are similarly constrained. And because data centers, manufacturing, and energy projects are accelerating simultaneously, the pressure is global, not regional.

Industry backlogs tell the story:

  • Data center construction backlogs average around 11 months.
  • Public infrastructure backlogs hover around 10 months, up from seven months in 2023.
  • Long lead materials are delaying groundbreaking and extending project durations. 

How firms can respond

  • Strategic procurement: Secure long lead items early, diversify suppliers, and negotiate allocation guarantees.
  • Scenario based planning: Model supply chain risks and adjust project sequencing accordingly.
  • Portfolio discipline: Prioritize projects with reliable supply chains and strong margins; avoid overcommitting capacity during peak volatility.
  • Collaborative contracting: Work with owners to align expectations around lead times, escalation, and risk sharing. 

Escalating costs and margin compression in the AI infrastructure cycle 

Boom cycles often lift prices, but they also magnify risk. Labor premiums, material inflation, and higher financing costs are eroding profitability across the sector. Owners are more cost sensitive, lenders are more cautious, and contractors are absorbing more risk than in previous cycles.

In large-scale infrastructure programs tied to AI-driven demand, even small cost fluctuations can materially affect project returns. Significant capital commitments and compressed delivery timelines leave little room for financial miscalculation. 

How firms can respond 

  • Data-driven project controls: AI-enhanced forecasting, real-time cost visibility, and automated variance detection help firms stay ahead of overruns. Integrated cost dashboards and predictive analytics allow leadership teams to identify risk exposure earlier in the project lifecycle, reducing the likelihood of late-stage financial surprises.
  • Disciplined bidding: Leading firms are walking away from low margin work and focusing on projects where they can deliver predictable outcomes. This selectivity is becoming increasingly important as competition intensifies, and long-term margin sustainability takes precedence over short-term backlog growth.
  • Smarter pricing: Dynamic pricing models and historical data analysis help firms price risk more accurately. Firms leveraging historical performance data across similar construction projects are better positioned to anticipate escalation trends and structure contracts accordingly.
  • Lean execution: Automation, modularization, and prefabrication reduce labor intensity and improve schedule reliability. In environments defined by supply chain volatility and labor constraints, these approaches also provide greater cost predictability and resilience across complex infrastructure builds. 

Regulatory, environmental, and community constraints 

The AI infrastructure boom is not universally welcomed. Communities, regulators, and policymakers are raising concerns that could slow or reshape project pipelines.

As large-scale infrastructure investments accelerate, scrutiny around environmental impact, power infrastructure capacity, and long-term community value creation is intensifying. 

Community resistance

Large data centers face scrutiny over:

  • Energy consumption and grid strain
  • Water usage for cooling
  • Land use and environmental impact
  • Limited long-term job creation

In many regions, questions around power required for hyperscale facilities and the strain placed on existing grid systems are becoming central to public debate. Advanced cooling systems, including liquid cooling technologies, are also under examination due to their water intensity and operational footprint.

Some regions have already paused or restricted new data center development.

These actions signal that rapid growth in digital infrastructure must now be balanced against sustainability expectations and local economic considerations.

Policy and permitting risk

Shifts in energy policy, environmental regulation, or tariffs can stall projects midstream. The renewable energy sector offers a cautionary tale as permitting delays and policy reversals have derailed billions in planned investment.

Bubble concerns

Bain & Company warned that to justify the massive wave of AI data center construction, the AI sector must reach extraordinary revenue levels by 2030. If it doesn’t, the industry could face an overcapacity correction reminiscent of the early 2000s dotcom buildout.

Even if many industry leaders dismiss near term bubble fears, prudent E&C executives are preparing for volatility. 

Technology adoption as a strategic risk mitigator 

While the boom introduces risk, it also accelerates innovation. A global survey of infrastructure leaders found:

  • AI adoption is rising rapidly, especially for design automation, schedule optimization, and risk detection.
  • Firms using AI report meaningful time and cost savings.
  • Data quality issues and skills gaps remain major barriers to scaling AI effectively.

As project complexity increases and large-scale infrastructure programs become more capital intensive, digital maturity is emerging as a structural advantage rather than a competitive luxury.

The takeaway: firms that embrace digital tools, not just on projects, but across their internal operations, will outperform peers in productivity, predictability, and resilience.  

Integrated data environments, standardized workflows, and AI-enabled analytics provide greater visibility across construction projects, helping firms anticipate delays, manage cost volatility, and respond to supply chain disruption.

But they must partner with the right technology leaders to ensure adoption and scaling.

Without disciplined implementation and workforce enablement, even advanced AI tools can fail to deliver long-term operational value. 

From risk management to strategic execution 

This article is the second in our three-part series on how AI is reshaping engineering and construction. In the next installment, we’ll explore: Building smart: five key strategies to thrive in the AI infrastructure boom.

After examining both opportunity and exposure, the final article will focus on the practical actions firms can take to build long-term resilience and competitive advantage.